{
 "meta": {
  "title": "Rig 3D",
  "subtitle": "Super-spec AC land rig",
  "well": [
   -4.689,
   6.05,
   -0.78
  ],
  "bounds": {
   "min": [
    -16.456,
    -0.3,
    -27.392
   ],
   "max": [
    13.444,
    50.866,
    24.27
   ]
  },
  "walkStart": [
   -12,
   0,
   27
  ],
  "walkYaw": -0.27,
  "terrain": {
   "x0": -56.5,
   "x1": 53.5,
   "zN": -61.72,
   "zS": 48.28
  },
  "anim": {
   "well": [
    -4.689,
    0,
    -0.78
   ],
   "floor": 6.05,
   "home": 18.62,
   "stand": 25.9,
   "crownLine": 48.876712799072266,
   "blockLine": 30.72,
   "linkPivot": 20.77,
   "elevTop": 18.240000000000002,
   "elevBot": 17.87,
   "hoseA": [
    -5.409,
    23.48,
    -0.33
   ],
   "hoseB": [
    -6.8,
    25.5,
    0.5
   ],
   "hoseLen": 20,
   "hoseR": 0.075,
   "svcA": [
    -4.009,
    23.04,
    -1.71
   ],
   "svcB": [
    -2.7,
    24.6,
    -2.5
   ],
   "svcLen": 19,
   "svcR": 0.06,
   "irCol": [
    -2.25,
    1.100000023841858
   ],
   "irDir": [
    -0.7920200228691101,
    -0.6104950904846191
   ],
   "irRetract": 1.45,
   "irReach": 3.0794677129515557,
   "setbackBot": [
    -5.45,
    6.05,
    1.52
   ],
   "setbackTop": [
    -5.85,
    31.95,
    1.52
   ],
   "slipsPark": [
    -5.85,
    6.05,
    0.2
   ],
   "stacks": [
    [
     -10.95,
     4.35,
     -20.815
    ],
    [
     -10.95,
     4.35,
     -23.165
    ],
    [
     -10.95,
     4.35,
     -25.515
    ]
   ],
   "windsock": [
    -40,
    6.95,
    -14
   ],
   "shakers": [
    {
     "x0": 6.462,
     "x1": 7.876,
     "z0": -2.241,
     "z1": -0.861,
     "y": 2.856
    },
    {
     "x0": 6.462,
     "x1": 7.876,
     "z0": 0.417,
     "z1": 1.797,
     "y": 2.856
    }
   ],
   "shakerSpring": [
    2.78,
    3.12
   ]
  },
  "wear": {
   "accumulator": "tex/wear/accumulator.ktx2",
   "vfd_house": "tex/wear/vfd_house.ktx2",
   "mast": "tex/wear/mast.ktx2",
   "shakers": "tex/wear/shakers.ktx2",
   "shakers__bed": "tex/wear/shakers__bed.ktx2",
   "drawworks": "tex/wear/drawworks.ktx2",
   "generators": "tex/wear/generators.ktx2",
   "drill_floor": "tex/wear/drill_floor.ktx2",
   "bop": "tex/wear/bop.ktx2",
   "mud_gas_separator": "tex/wear/mud_gas_separator.ktx2",
   "choke_manifold": "tex/wear/choke_manifold.ktx2",
   "pipe_racks": "tex/wear/pipe_racks.ktx2",
   "scenery": "tex/wear/scenery.ktx2",
   "mud_tanks": "tex/wear/mud_tanks.ktx2",
   "standpipe": "tex/wear/standpipe.ktx2",
   "substructure": "tex/wear/substructure.ktx2",
   "doghouse": "tex/wear/doghouse.ktx2",
   "crew_quarters": "tex/wear/crew_quarters.ktx2",
   "catwalk": "tex/wear/catwalk.ktx2",
   "shakers__springs": "tex/wear/shakers__springs.ktx2",
   "racking_board": "tex/wear/racking_board.ktx2",
   "scenery__vehicles": "tex/wear/scenery__vehicles.ktx2",
   "iron_roughneck__arm": "tex/wear/iron_roughneck__arm.ktx2",
   "iron_roughneck": "tex/wear/iron_roughneck.ktx2",
   "iron_roughneck__mid": "tex/wear/iron_roughneck__mid.ktx2",
   "mud_pumps": "tex/wear/mud_pumps.ktx2",
   "offices": "tex/wear/offices.ktx2",
   "drill_floor__slips": "tex/wear/drill_floor__slips.ktx2",
   "traveling_block": "tex/wear/traveling_block.ktx2",
   "top_drive": "tex/wear/top_drive.ktx2",
   "top_drive__links": "tex/wear/top_drive__links.ktx2",
   "top_drive__shaft": "tex/wear/top_drive__shaft.ktx2",
   "walking_system": "tex/wear/walking_system.ktx2",
   "scenery__windsock": "tex/wear/scenery__windsock.ktx2"
  },
  "ktx2": true
 },
 "parts": [
  {
   "id": "mast",
   "num": 1,
   "name": "Mast and Crown Block",
   "system": "Hoisting",
   "summary": "The tall steel tower that carries every load the rig lifts. The crown block at the top holds the fixed sheaves the drilling line runs over.",
   "specs": [
    [
     "Clear height",
     "142 ft"
    ],
    [
     "Rated hookload",
     "750,000 lb"
    ],
    [
     "Raising",
     "Hydraulic cylinders"
    ]
   ],
   "narration": "This is the mast, the steel tower that carries every load the rig lifts. On a modern super-spec rig it stands about one hundred and forty feet above the drill floor and is rated for around seven hundred and fifty thousand pounds. At the very top sits the crown block, a cluster of fixed pulleys called sheaves. The drilling line runs from the drawworks up to these sheaves and back down to the traveling block, again and again, so the rig can lift huge weights with a single steel cable. The mast is raised and lowered with hydraulic cylinders when the rig moves to a new location.",
   "anchor": [
    -4.689,
    52.066,
    -0.78
   ],
   "mesh": "mast",
   "audio": "audio/01-mast.mp3"
  },
  {
   "id": "traveling_block",
   "num": 2,
   "name": "Traveling Block",
   "system": "Hoisting",
   "summary": "A moving set of sheaves strung to the crown block. Together they multiply the pull of the drawworks to lift the drill string.",
   "specs": [
    [
     "Lines strung",
     "8 to 12"
    ],
    [
     "Rated load",
     "500 ton class"
    ],
    [
     "Hangs",
     "Top drive"
    ]
   ],
   "narration": "This yellow assembly is the traveling block. It is a set of pulleys that hangs on the drilling line and moves up and down inside the mast. The line is threaded back and forth between the traveling block and the crown block, usually eight to twelve times. Each pass shares the load, so the pull from the drawworks is multiplied many times over. That is how a single cable can lift a drill string weighing hundreds of thousands of pounds. On this rig, the top drive hangs directly below the block.",
   "anchor": [
    -4.689,
    31.47,
    -0.78
   ],
   "mesh": "traveling_block",
   "audio": "audio/02-traveling-block.mp3"
  },
  {
   "id": "top_drive",
   "num": 3,
   "name": "Top Drive",
   "system": "Rotating",
   "summary": "A powerful AC motor that hangs from the traveling block and turns the drill string from the top, while drilling mud is pumped through it.",
   "specs": [
    [
     "Rating",
     "500 ton"
    ],
    [
     "Drive",
     "AC electric"
    ],
    [
     "Guided by",
     "Torque track"
    ]
   ],
   "narration": "This is the top drive, the heart of a modern rig. It is a powerful electric motor that hangs from the traveling block and screws directly onto the top of the drill pipe. It turns the whole drill string from above, while drilling mud is pumped down through its center. The top drive rides up and down on a torque track fixed to the back of the mast, which stops it from spinning. Top drives replaced the old kelly and rotary table drive, and they let crews drill with ninety foot stands of pipe instead of single thirty foot joints.",
   "anchor": [
    -5.589,
    22.778,
    -0.18
   ],
   "mesh": "top_drive",
   "audio": "audio/03-top-drive.mp3"
  },
  {
   "id": "racking_board",
   "num": 4,
   "name": "Racking Board and Stands",
   "system": "Pipe handling",
   "summary": "A platform high in the mast where stands of pipe are stored upright while the drill string is pulled out of or run into the hole.",
   "specs": [
    [
     "Board height",
     "About 85 ft"
    ],
    [
     "Stand length",
     "90 ft (triples)"
    ],
    [
     "Operator",
     "Derrickhand"
    ]
   ],
   "narration": "High in the mast is the racking board, sometimes called the monkey board. When the crew pulls the drill string out of the hole, they unscrew it into stands of three joints, about ninety feet long. The tops of those stands are guided into the fingers of the racking board, and the bottoms rest on the drill floor below. A crew member called the derrickhand works up here, although many modern rigs now use automated pipe racking systems. The long black column you can see beside the well is pipe stored this way.",
   "anchor": [
    -6.342,
    32.472,
    1.888
   ],
   "mesh": "racking_board",
   "audio": "audio/04-racking-board.mp3"
  },
  {
   "id": "drill_floor",
   "num": 5,
   "name": "Drill Floor and Rotary Table",
   "system": "Rig floor",
   "summary": "The main work deck over the well. The rotary table at its center holds the slips that grip the pipe when it is not hanging from the top drive.",
   "specs": [
    [
     "Floor height",
     "About 20 ft"
    ],
    [
     "Rotary opening",
     "27.5 in typical"
    ],
    [
     "Pipe arrives",
     "Through the V-door"
    ]
   ],
   "narration": "This is the drill floor, the main work deck of the rig, sitting directly over the well. In the center is the rotary table. On a top drive rig it rarely turns the pipe any more. Instead, it holds the slips, wedge shaped grips that hang the drill string while connections are made or broken. Around it are the iron roughneck, the driller's cabin, and the V-door, where new pipe arrives from the catwalk. Most of the hands on work during drilling happens here.",
   "anchor": [
    -3.489,
    7.45,
    1.02
   ],
   "mesh": "drill_floor",
   "audio": "audio/05-drill-floor.mp3"
  },
  {
   "id": "iron_roughneck",
   "num": 6,
   "name": "Iron Roughneck",
   "system": "Pipe handling",
   "summary": "A hydraulic robot on the drill floor that spins pipe connections together and applies the final torque, replacing manual tongs.",
   "specs": [
    [
     "Functions",
     "Spin, make-up, break-out"
    ],
    [
     "Control",
     "From driller's cabin"
    ],
    [
     "Replaces",
     "Manual tongs and chains"
    ]
   ],
   "narration": "This machine is the iron roughneck. Every time a stand of pipe is added or removed, the threaded connection has to be spun together and tightened to a precise torque, or broken loose and spun apart. Crews once did this by hand with heavy tongs and spinning chains, which was among the most dangerous jobs on the rig. The iron roughneck reaches in on its telescoping arm, spins the joint with powered rollers, then torques it with a pair of hydraulic wrenches. It is controlled from the driller's cabin, keeping people out of the danger zone.",
   "anchor": [
    -2.247,
    8.499,
    1.1
   ],
   "mesh": "iron_roughneck",
   "audio": "audio/06-iron-roughneck.mp3"
  },
  {
   "id": "drawworks",
   "num": 7,
   "name": "Drawworks",
   "system": "Hoisting",
   "summary": "The rig's giant winch. Its drum spools the drilling line to raise and lower the traveling block, top drive and drill string.",
   "specs": [
    [
     "Power",
     "1,500 hp AC"
    ],
    [
     "Braking",
     "Regenerative + mechanical"
    ],
    [
     "Line",
     "1-1/2 in wire rope"
    ]
   ],
   "narration": "This is the drawworks, the rig's giant winch. A large drum spools the drilling line in and out, raising and lowering the traveling block, the top drive and everything hanging below them. On this rig the drawworks is driven by AC electric motors rated at around fifteen hundred horsepower. The same motors can act as brakes, feeding energy back into the system as heavy loads are lowered. The large spool nearby holds a supply of new drilling line, which is fed through the system and slipped and cut regularly as the line wears.",
   "anchor": [
    -4.46,
    9.8,
    -3
   ],
   "mesh": "drawworks",
   "audio": "audio/07-drawworks.mp3"
  },
  {
   "id": "doghouse",
   "num": 8,
   "name": "Driller's Cabin",
   "system": "Control",
   "summary": "The climate-controlled cabin on the drill floor where the driller runs the rig from joystick chairs and screens.",
   "specs": [
    [
     "Seats",
     "Driller + assistant"
    ],
    [
     "Controls",
     "Joysticks, touch screens"
    ],
    [
     "Shows",
     "Weight, torque, pressure, depth"
    ]
   ],
   "narration": "This is the driller's cabin, often still called the doghouse. From here the driller runs the whole rig. Modern cabins have joystick chairs and touch screens that control the drawworks, top drive, mud pumps and pipe handling machines, and show live readings of hook load, torque, pump pressure and depth. The cabin is placed beside the drill floor with a clear view of the well. It also serves as the crew's base on the rig floor, with paperwork, radios and safety equipment close at hand.",
   "anchor": [
    -11.91,
    9.67,
    -1.495
   ],
   "mesh": "doghouse",
   "audio": "audio/08-doghouse.mp3"
  },
  {
   "id": "substructure",
   "num": 9,
   "name": "Substructure",
   "system": "Structure",
   "summary": "The tall steel base that lifts the drill floor about 20 ft, leaving room underneath for the blowout preventer stack.",
   "specs": [
    [
     "Floor height",
     "About 20 ft"
    ],
    [
     "Clear height",
     "Room for BOP stack"
    ],
    [
     "Type",
     "Box-on-box"
    ]
   ],
   "narration": "Everything on the drill floor sits on the substructure, the tall steel frame you see here. It does two jobs. It supports the full weight of the mast, the drill string and the pipe racked in the mast. And it lifts the drill floor high enough to fit the blowout preventer stack and wellhead underneath. The stairs and walkways that let the crew climb up to the floor are attached to it as well. On a walking rig, the substructure is built to move as one piece from well to well.",
   "anchor": [
    -13.014,
    4.2,
    3
   ],
   "mesh": "substructure",
   "audio": "audio/09-substructure.mp3"
  },
  {
   "id": "walking_system",
   "num": 10,
   "name": "Walking System",
   "system": "Moving",
   "summary": "Hydraulic feet at the corners of the substructure that lift the rig and step it to the next well on the pad.",
   "specs": [
    [
     "Feet",
     "4 hydraulic walkers"
    ],
    [
     "Typical move",
     "Tens of feet per well"
    ],
    [
     "Benefit",
     "No rig-down between wells"
    ]
   ],
   "narration": "These are the rig's walking feet. Modern shale wells are drilled in groups from a single pad, often only a few dozen feet apart. Instead of taking the rig apart to move it, hydraulic cylinders in each foot lift the entire rig a few inches off the ground. Then a second set of cylinders slides the foot sideways, and the rig is set back down in its new position. Step by step, the whole rig, mast and all, walks to the next well. Moves that once took days can now be done in a few hours.",
   "anchor": [
    0.626,
    2.5,
    7.308
   ],
   "mesh": "walking_system",
   "audio": "audio/10-walking-system.mp3"
  },
  {
   "id": "catwalk",
   "num": 11,
   "name": "Pipe-Handling Catwalk",
   "system": "Pipe handling",
   "summary": "A hydraulic machine that carries pipe from the ground-level racks up to the drill floor through the V-door.",
   "specs": [
    [
     "Lifts",
     "Pipe, collars, casing"
    ],
    [
     "Reach",
     "Up to drill floor"
    ],
    [
     "Control",
     "Remote, from cabin or pendant"
    ]
   ],
   "narration": "This long machine is the hydraulic catwalk. It moves pipe between the racks on the ground and the drill floor. Arms called indexers roll a joint of pipe from the racks into the trough. Then the boom tilts up toward the V-door, the opening on the side of the drill floor, and a skate pushes the pipe up so the top drive's elevator can grab it. The process also works in reverse. Crews used to drag pipe up a slide with a winch line, so this machine has made pipe handling far safer and faster.",
   "anchor": [
    -4.814,
    7.733,
    13.639
   ],
   "mesh": "catwalk",
   "audio": "audio/11-catwalk.mp3"
  },
  {
   "id": "pipe_racks",
   "num": 12,
   "name": "Pipe Racks",
   "system": "Pipe handling",
   "summary": "Ground-level racks that hold drill pipe, drill collars and casing waiting to go into the hole.",
   "specs": [
    [
     "Holds",
     "Drill pipe, collars, casing"
    ],
    [
     "Joint length",
     "About 31 ft"
    ],
    [
     "Height",
     "Knee high"
    ]
   ],
   "narration": "Beside the catwalk are the pipe racks. They hold the joints of drill pipe, heavy drill collars and casing that are waiting to go into the well. A typical joint of drill pipe is about thirty one feet long. The racks keep the pipe off the ground, clean and in order, so each joint can be rolled onto the catwalk when it is needed. Pipe is also measured and inspected here, since the crew keeps a careful tally of every joint that goes into the hole.",
   "anchor": [
    -5.35,
    1.35,
    13.589
   ],
   "mesh": "pipe_racks",
   "audio": "audio/12-pipe-racks.mp3"
  },
  {
   "id": "bop",
   "num": 13,
   "name": "Blowout Preventer Stack",
   "system": "Well control",
   "summary": "A stack of large valves bolted to the wellhead that can seal the well if pressure from the formation surges up the hole.",
   "specs": [
    [
     "Size",
     "13-5/8 in"
    ],
    [
     "Rating",
     "10,000 psi"
    ],
    [
     "Elements",
     "Annular + ram preventers"
    ]
   ],
   "narration": "Under the drill floor sits the blowout preventer stack, the most important safety equipment on the rig. It is a stack of very large valves bolted to the top of the well. If high pressure gas or fluid from the rock enters the well, called a kick, the crew can close the stack and seal the well. The annular preventer at the top squeezes a rubber element around any pipe. Below it, ram preventers close steel blocks across the hole, and blind shear rams can cut the pipe and seal the well completely.",
   "anchor": [
    -5.505,
    3.2,
    1.031
   ],
   "mesh": "bop",
   "audio": "audio/13-bop.mp3"
  },
  {
   "id": "accumulator",
   "num": 14,
   "name": "BOP Accumulator",
   "system": "Well control",
   "summary": "A bank of pressurized bottles that stores hydraulic energy so the blowout preventers can be closed within seconds, even without rig power.",
   "specs": [
    [
     "Pressure",
     "3,000 psi"
    ],
    [
     "Close time",
     "Seconds"
    ],
    [
     "Also called",
     "Koomey unit"
    ]
   ],
   "narration": "This red unit is the BOP accumulator, often called a Koomey unit. It is a bank of steel bottles charged with nitrogen and hydraulic fluid at about three thousand pounds per square inch. That stored energy is what closes the blowout preventers. Because it is stored ahead of time, the preventers can be closed within seconds, even if the rig loses power. The accumulator is placed a safe distance from the well, and the BOPs can be operated from here or remotely from the driller's cabin.",
   "anchor": [
    -10.934,
    3.779,
    -14.221
   ],
   "mesh": "accumulator",
   "audio": "audio/14-accumulator.mp3"
  },
  {
   "id": "choke_manifold",
   "num": 15,
   "name": "Choke Manifold",
   "system": "Well control",
   "summary": "An arrangement of valves and adjustable chokes used to release well pressure in a controlled way after the BOPs are closed.",
   "specs": [
    [
     "Rating",
     "10,000 psi"
    ],
    [
     "Chokes",
     "Adjustable + remote"
    ],
    [
     "Routes to",
     "Mud-gas separator"
    ]
   ],
   "narration": "Once the blowout preventers are closed on a kick, the pressure in the well still has to be dealt with. That is the job of the choke manifold. It is a set of high pressure valves and adjustable chokes connected to the BOP stack. By slowly opening and closing the chokes, the crew holds just the right back pressure on the well while they pump heavier mud down to regain control. The returning fluid is routed through the manifold to the mud-gas separator.",
   "anchor": [
    4.61,
    3.214,
    3.296
   ],
   "mesh": "choke_manifold",
   "audio": "audio/15-choke-manifold.mp3"
  },
  {
   "id": "mud_pumps",
   "num": 16,
   "name": "Mud Pumps",
   "system": "Circulating",
   "summary": "Large high-pressure pumps that push drilling fluid down the drill string, out through the bit and back up to the surface.",
   "specs": [
    [
     "Type",
     "Triplex"
    ],
    [
     "Power",
     "1,600 hp each"
    ],
    [
     "Pressure",
     "Up to 7,500 psi"
    ]
   ],
   "narration": "These are the mud pumps. Drilling fluid, called mud, is constantly circulated down the inside of the drill pipe, out through the bit, and back up the outside of the pipe to the surface. The mud cools the bit, carries rock cuttings out of the hole, and its weight holds back pressure in the rock. Super-spec rigs usually have three triplex pumps of about sixteen hundred horsepower each, able to push mud at up to seven thousand five hundred pounds per square inch.",
   "anchor": [
    1.94,
    3.66,
    -19.015
   ],
   "mesh": "mud_pumps",
   "audio": "audio/16-mud-pumps.mp3"
  },
  {
   "id": "standpipe",
   "num": 23,
   "name": "Standpipe and Rotary Hose",
   "system": "Circulating",
   "summary": "The vertical high-pressure pipe on the mast that carries mud from the pumps up to the rotary hose, which loops across to the top drive.",
   "specs": [
    [
     "Rating",
     "7,500 psi"
    ],
    [
     "Hose",
     "Flexible, steel-reinforced"
    ],
    [
     "Feeds",
     "Top drive gooseneck"
    ]
   ],
   "narration": "This tall red pipe running up the mast is the standpipe, the high pressure highway for drilling mud. The mud pumps push fluid through steel lines to the standpipe manifold on the drill floor, and the standpipe carries it up the mast to a gooseneck. From there the rotary hose, a heavy flexible hose reinforced with steel, loops across to the top drive. The hose has to bend because the top drive travels up and down as the well is drilled. Valves on the manifold let the crew route the mud or shut in pressure.",
   "anchor": [
    -7.55,
    13,
    1.55
   ],
   "mesh": "standpipe",
   "audio": "audio/23-standpipe.mp3"
  },
  {
   "id": "mud_tanks",
   "num": 17,
   "name": "Mud Tanks",
   "system": "Circulating",
   "summary": "A row of steel tanks that store, mix and condition the drilling fluid before it goes back down the hole.",
   "specs": [
    [
     "Active volume",
     "About 850 bbl"
    ],
    [
     "Equipment",
     "Agitators, mixing hopper"
    ],
    [
     "Also",
     "Trip tank"
    ]
   ],
   "narration": "The long row of tanks here is the mud system. It stores the drilling fluid and keeps it in good condition. Agitators stir the mud so solids do not settle, and a mixing hopper is used to add chemicals and weighting material. The tanks are divided into compartments, with clean mud in the suction tank feeding the pumps. A smaller trip tank is used to measure exactly how much fluid the hole takes or gives back, which is one of the crew's main ways of spotting a kick early.",
   "anchor": [
    6.744,
    5.629,
    -11.75
   ],
   "mesh": "mud_tanks",
   "audio": "audio/17-mud-tanks.mp3"
  },
  {
   "id": "shakers",
   "num": 18,
   "name": "Shale Shakers",
   "system": "Circulating",
   "summary": "Vibrating screens that strip rock cuttings out of the mud returning from the well.",
   "specs": [
    [
     "Stage",
     "First solids removal"
    ],
    [
     "Screens",
     "Fine mesh, vibrating"
    ],
    [
     "Followed by",
     "Desilter, centrifuge"
    ]
   ],
   "narration": "Mud coming back from the well is full of rock cuttings, and the shale shakers are the first step in cleaning it. The mud flows onto vibrating screens of fine wire mesh. The liquid falls through, while the cuttings are shaken off the end into a bin. Geologists collect samples of these cuttings to see what rock is being drilled. After the shakers, finer equipment such as desilters and centrifuges removes even smaller particles before the mud is pumped back down the hole.",
   "anchor": [
    6.714,
    4.828,
    -0.125
   ],
   "mesh": "shakers",
   "audio": "audio/18-shakers.mp3"
  },
  {
   "id": "mud_gas_separator",
   "num": 19,
   "name": "Mud-Gas Separator",
   "system": "Well control",
   "summary": "A tall vessel, often called a gas buster, that separates gas from returning mud and vents it safely away from the rig.",
   "specs": [
    [
     "Also called",
     "Gas buster"
    ],
    [
     "Feeds from",
     "Choke manifold"
    ],
    [
     "Vents to",
     "Flare line"
    ]
   ],
   "narration": "This tall red vessel is the mud-gas separator, often called the gas buster. When the crew circulates out a kick through the choke manifold, the returning mud can be full of gas. Inside the separator, the mud splashes over baffles and the gas breaks free. The gas rises out of the top and is piped away to a flare, a safe distance from the rig, while the degassed mud drains back to the mud tanks. It is a simple vessel, but a vital part of the well control system.",
   "anchor": [
    11.279,
    7.796,
    6.045
   ],
   "mesh": "mud_gas_separator",
   "audio": "audio/19-mud-gas-separator.mp3"
  },
  {
   "id": "generators",
   "num": 20,
   "name": "Generator Sets",
   "system": "Power",
   "summary": "Diesel or natural gas engines driving electric generators that power the entire rig.",
   "specs": [
    [
     "Units",
     "3 to 4 sets"
    ],
    [
     "Output",
     "About 1,100 kW each"
    ],
    [
     "Fuel",
     "Diesel or natural gas"
    ]
   ],
   "narration": "These enclosures house the rig's power plant. Each one holds a large diesel or natural gas engine driving an electric generator, and together they produce several megawatts of power. A super-spec rig usually runs three or four of these sets, starting and stopping them to match the load. Many rigs now burn natural gas or a blend of fuels, and some connect to the power grid, to cut fuel costs and emissions. All of that electricity flows to the VFD house next door.",
   "anchor": [
    -11.991,
    5.15,
    -23.165
   ],
   "mesh": "generators",
   "audio": "audio/20-generators.mp3"
  },
  {
   "id": "vfd_house",
   "num": 21,
   "name": "VFD House",
   "system": "Power",
   "summary": "The electrical control house. Its variable-frequency drives control the speed and torque of the AC motors across the rig.",
   "specs": [
    [
     "Controls",
     "Drawworks, top drive, pumps"
    ],
    [
     "Technology",
     "Variable-frequency drives"
    ],
    [
     "Cabling",
     "Through cable trays"
    ]
   ],
   "narration": "This building is the VFD house, the rig's electrical control center. Power from the generators comes in here, and variable frequency drives control the speed and torque of the big AC motors on the drawworks, top drive and mud pumps. This precise control is what makes a modern AC rig so efficient and smooth to operate compared with older mechanical and DC rigs. Heavy cables run from this house through cable trays to every major machine on the rig.",
   "anchor": [
    -3.266,
    3.662,
    -21.731
   ],
   "mesh": "vfd_house",
   "audio": "audio/21-vfd-house.mp3"
  },
  {
   "id": "bit_bha",
   "num": 22,
   "name": "Drill Bit and BHA",
   "system": "Downhole",
   "summary": "The tools at the bottom of the drill string: the bit that cuts the rock, a mud motor and the measurement tools that steer the hole.",
   "specs": [
    [
     "Bit",
     "PDC, 8-3/4 in typical"
    ],
    [
     "Motor",
     "Bent-housing mud motor"
    ],
    [
     "Steering",
     "MWD survey tools"
    ]
   ],
   "narration": "Everything on the surface exists to turn one small tool, the drill bit, thousands of feet below. Most shale wells are drilled with PDC bits, which have industrial diamond cutters that shear the rock. Above the bit sits a mud motor, turned by the flow of mud, with a slight bend that lets the driller steer the well. Measurement while drilling tools send the direction and angle of the hole back to the surface as pressure pulses in the mud. Together these make up the bottom hole assembly, or BHA.",
   "anchor": [
    -2.889,
    1,
    0.82
   ],
   "mesh": null,
   "audio": "audio/22-bit-bha.mp3"
  },
  {
   "id": "offices",
   "num": 24,
   "name": "Offices",
   "system": "Site camp",
   "summary": "Skid-mounted office trailers for the company man and the toolpusher, where the well is planned, monitored and reported.",
   "specs": [
    [
     "Occupants",
     "Company man, toolpusher"
    ],
    [
     "Typical size",
     "40 ft x 12 ft skid house"
    ],
    [
     "Connected by",
     "Satellite internet and radio"
    ]
   ],
   "narration": "These two trailers are the rig's offices. One belongs to the company man, who represents the oil company that owns the well and makes the big decisions about how it is drilled. The other belongs to the toolpusher, the drilling contractor's rig manager, who runs the crew and keeps the rig itself working. From here they watch live drilling data, plan the next steps, order supplies and send daily reports to town. Satellite internet keeps even the most remote pad connected around the clock.",
   "anchor": [
    -39.1,
    5.271,
    -55.178
   ],
   "mesh": "offices",
   "audio": "audio/24-offices.mp3"
  },
  {
   "id": "crew_quarters",
   "num": 25,
   "name": "Crew Quarters",
   "system": "Site camp",
   "summary": "Skid houses where the crews eat, sleep and rest between twelve-hour shifts, often weeks at a time.",
   "specs": [
    [
     "Shifts",
     "Two 12-hour tours"
    ],
    [
     "Typical hitch",
     "14 days on, 14 off"
    ],
    [
     "Moves with",
     "The rig, by truck"
    ]
   ],
   "narration": "These skid houses are the crew quarters. A drilling rig runs twenty four hours a day, so two crews work back to back twelve hour shifts, called tours. On many rigs the crews live on location for their whole hitch, often two weeks on and two weeks off. Each house holds bunk rooms, a bathroom and sometimes a kitchen and laundry. Like everything else on the pad, they sit on steel skids, so they can be loaded onto trucks and moved when the rig walks to the next well site.",
   "anchor": [
    -32.5,
    4.49,
    -39.482
   ],
   "mesh": "crew_quarters",
   "audio": "audio/25-crew-quarters.mp3"
  }
 ]
}